DSM System installed in the University of Wisconsin Stadium

University of Wisconsin Badgers, Camp Randall Stadium

Wisconsin

Date: 2009-2018

DSM System installed in the University of Wisconsin Stadium

Badgers join Packers, Bucs, Astros, Riverdogs, and many more in failed caulk joint replacement

Replacement nearly every year of failed caulk and backer rod became tiresome to the University of Wisconsin. This led them to join a growing number of stadium managers and facility owners to begin a staged retrofit of all of the stadium joints. From EMSEAL’s complete line of stadium expansion joints, the engineers selected the precompressed foam sealant DSM System. After removing the failed liquid sealant, the joint faces were cleaned with grinders to remove old sealant residue, then the DSM System was installed. Transitions at all inside and outside corners of the treads and risers were field fabricated by the experienced, EMSEAL-preferred contractor. The finished installation ensures that the precompressed sealant will handle thermal movements free of adhesion in tension at the bondline and with minimal tension within the sealant itself.

DSM System installed in the University of Wisconsin Stadium
DSM System installed in the University of Wisconsin Stadium