EMSEAL
Expansion Joints and Pre-Compressed Sealants



Case Studies and Project Profiles:

 

What are people saying about EMSEAL?
Project References: Who else is using EMSEAL?
 


(click links or images for project profiles)

474 Lake Shore Drive, Chicago, IL

DSM SYSTEM
Retrofit 2013

Atlantic Station, Atlanta, GA

MIGUTAN FP, THERMAFLEX, COLORSEAL, MIGUTRANS
New-2004-05
Parking, Plaza

Baltimore Ravens M&T Bank Stadium

THERMAFLEX, COLORSEAL
New, 1998

Walls and concourses

Basra Sports City, FIFA Soccer and Olympic Track and Field Stadium, Basra, Iraq

SJS SYSTEM, EMCRETE
New--2013
Treads and risers

Bogota El Dorado International Airport, Columbia
(English)  /  (en espanol)

SJS SYSTEM, EMSHIELD SJS-FR1, and EMSHIELD SJS-FR2
New - 2012/13
Interior Floor and Exterior Sidewalks

Fenway_From_Legends_by_Jared_Vincent Boston Red Sox Fenway Park, MA

MIGUTAN FP, COLORSEAL
Retrofit, 2003

Split-slab concourse

Buffalo Thunder Resort and Casino, Santa Fe, NM

COLORSEAL
Retrofit 2012
Replacement of failed color joint, precured-caulk-and-backer-block

Brooklyn Cyclones MCU Park (formerly Keyspan Park, Coney Island, NY

MIGUTAN FP, THERMAFLEX, COLORSEAL
New, 2001
Walls, treads and risers, split slab top deck

Calgary Airport Trail Tunnel: RWS-Rated Expansion Joints

 EMSHIELD DFR3-RWS
New, 2013
RWS-compliant tunnel expansion joints in RWS fireproofing

Center of Clayton, Clayton, MO

COLORSEAL
New, 2000
Inside corner mullion to brick

Clinton County Courthouse, Ohio

HORIZONTAL COLORSEAL
Retrofit, 1992
Failed caulk and backer rod

Condo On the Bay Parking Deck, Sarasota, FL

THERMAFLEX
Retrofit, 2006
Failed winged compression seal

CONRAC, Hartsfield-Jackson International Airport, Atlanta, GA 2.8 Million Square Foot Parking Facility

SJS SYSTEM, THERMAFLEX, MIGUTRANS, SEISMIC COLORSEAL, HORIZONTAL COLORSEAL, DSM SYSTEM
New 2009

EMC Corporate Office Building & Parking Deck, Hopkinton, MA

DSM SYSTEM
Retrofit-2007
Failed "jeene"

Empire State Building, New York, NY

BACKERSEAL
Retrofit-2008-2009

Caulk and backer rod

Green Bay Packers, Lambeau Field

DSM SYSTEM, SJS SYSTEM
Retrofit-2007-09
Failed caulk and backer rod

Guggenheim Museum, 20-year Run in New York City makes COLORSEAL a Permanent Exhibit at Historic Landmark Museum

COLORSEAL
New to Existing, 1992

Hilton Boston Logan, Logan International Airport

SEISMIC COLORSEAL
New-1998
Substitute for wall strip seal

Jamaica Wastewater Treatment Plant Digester Lids, NY

DSM-DS SYSTEM
Retrofits 2008, 2010

Jet Blue Terminal, JFK International Airport, NY, NY

MIGUTAN FP
New-2007
Split-slab, curved, roadway

Kansas City Royals Kauffman Stadium

MIGUTRANS, COLORSEAL, THERMAFLEX
Retrofit, 2009
Failed premold, caulk and backer rod, compression seal

Kinnick Stadium, U of Iowa, Iowa City, IA

DSH SYSTEM
Retrofit-2006

Failed caulk and backer rod

Lambert-St. Louis International Airport, St. Louis

COLORSEAL
Retrofit-2000

Lawrence Municipal Stadium, Lawrence, MA

THERMAFLEX
Retrofit-2005
Failed caulk and backer rod

Lincoln Performing Arts Center plaza deck expansion joint retrofit

MIGUTAN FP
Retrofit, 2008
Failed looped membrane and gutter

Longaberger Basket, Newark, OH

BACKERSEAL
New-1997
Secondary seal to liquid silicone

Mall of America, Bloomington, MN

BACKERSEAL
New-1992
Secondary seal to liquid urethane

Mississauga Living Arts Center, ON

COLORSEAL
Retrofit-2000
Failed caulk and backer rod

Montana State University Bobcats Stadium

DSM SYSTEM
Retrofit-2011

Failed caulk and backer rod

NY Mets, Citi Field

SJS SYSTEM, COLORSEAL
New-2009

Niketown, Newbury Street, Boston, MA

25V
New to Existing, 1998

Orlando International Airport Southwest Terminal, Orlando, FL

MIGUTRANS
FS 75, New, 2003
Failed premold

Phillies Citizens Bank Philadelphia  Ballpark

THERMAFLEX, MIGUTAN FP, COLORSEAL, 20H
New, 2004

Port Allen Locks, New Orleans, LA

DSM SYSTEM Immersed
Retrofit, 2009

Failed caulk and backer rod

Precision Living, Senior Living, St. Louis, MO

SEISMIC COLORSEAL
New-to-Existing, 2011

President's Plaza, Chicago, IL

MIGUTAN FP
Retrofit-2001
Failed bolt-down on split slab

Prudential Center, Boston, MA 

SJS SYSTEM
Retrofit, 2006

Failed roadway strip seal

Tampa_International_by_James_G_Howes Tampa International Airport, FL

MIGUTRANS FS-75
Retrofit, 2006

Failed interior rubber and rail floor cover

University of Massachusetts Medical Center, Worcester, MA

DSM SYSTEM
Retrofit-2007
Failed compression seal, caulk and backer rod, wax-saturated foam

Venetian Pool Deck

SJS SYSTEM
Retrofit 2013
Failed cover plate and gutter

Washington DC Convention Center

TWINSERT
Interior Joint Retrofit-2008
Failed "allure" and interior floor cover plate

Washington Redskins FedEx Field

THERMAFLEX
Retrofit,2000-05
Failed premold

Wheeling Tunnel Roof Lining, Wheeling, WV

DSM-DS SYSTEM
Retrofits 2008, 2010
Failed "waterstop" and compression seal

Woodbine Slots, Toronto, ON

MIGUTRANS
Retrofit, 2000
Failed rubber and rail floor joints

Will Rogers World Airport Parking Garage, Oklahoma City, OK

DSM SYSTEM
Retrofit-2012-13

 

Wyeth Labs, Life Sciences Building, PA

COLORSEAL
New, 2002
Curtain-wall, brick, gypsum, sky-bridge

Zurich Insurance, Baltimore, MD

THERMAFLEX
New, 2001

100 Cambridge Street, Boston, MA

MIGUTAN FP, COLORSEAL
New-2003

300 North Park, Chicago, IL

MIGUTAN FP
Retrofit, 1998
Failed looped membrane

 


 

EMSEAL JOINT SYSTEMS LTD. 25 Bridle Lane, Westborough, MA 01581
EMSEAL LLC. 120 Carrier Drive, Toronto, ON M9W 5R1

1-800-526-8365 -- 508-836-0280 --  techinfo@emseal.com -- Fax: 508-836-0281

Last Modified: April 14, 2014

Copyright © 1998-2014 by EMSEAL Joint Systems, Ltd. All rights reserved.
This document may not be reproduced in whole or in part without permission.